Contact Number
After the equipment exceeds the warranty period, you can choose an annual maintenance service or request a one-time repair as needed. The group has a spare parts warehouse and keeps core components in stock. Branches nationwide can respond to on-site maintenance requests, and overseas customers can contact local service outlets.
First check whether the sample or fixture is colliding with the table surface; for water-cooled models, confirm that the cooling water system is operating normally; if the equipment runs continuously at full load for a long time, it is recommended to keep the actual load within 70% of the rated load. If a coil overheat alarm occurs, stop the equipment immediately and contact an engineer for troubleshooting. Do not continue to operate the equipment.
First check the installation environment of the equipment. Leave sufficient space around the equipment for ventilation and heat dissipation. It is recommended to maintain the ambient temperature at 5–30°C. Dust accumulation on the condenser will directly reduce cooling performance, so dust should be cleaned regularly.
If the sample load is too large or the samples block the air duct, heat will accumulate inside the chamber, causing the temperature to fail to reach the setpoint. Leave ventilation gaps between samples.
Abnormal heating may be caused by abnormalities in the heating components or solid-state relays; insufficient cooling may be due to degraded performance of the refrigerant or compressor. If such hardware abnormalities occur, please contact Haida after-sales service for an on-site inspection. It is not recommended to add refrigerant yourself.
Common causes:
The temperature/humidity sensor is loose or has drifted, requiring calibration.
The chamber door seal is aged, causing air leakage.
The PID control parameters have been modified by mistake.
Samples are stacked and block the circulating air duct.
Prioritize checking the sample placement. After eliminating operational factors, you may contact Haida for sensor calibration and parameter optimization.
Production ESS stress screening has two application scenarios. If only temperature-only stress screening is to be carried out, a rapid temperature change test chamber alone is sufficient. If simultaneous temperature-vibration stress screening is required, a rapid temperature change chamber combined with a vibration shaker can be selected, or a combined temperature-humidity-vibration test system can be used. Haida's technical engineers will consider the customer's actual application, distinguish between laboratory R&D testing and production-line mass-production screening scenarios, provide suitable configuration recommendations, and help customers reasonably plan procurement costs.